Businesses in this industry may conduct activities that potentially meet the qualified-research requirements. Industry alone does not determine eligibility. Explore credits with the R&D Credit Finder.

What R&D can look like

  • Designing HVAC systems for unusual loads or environments with modeling of alternatives.
  • Electrical distribution designs for novel requirements.
  • Energy-recovery systems with uncertain performance.

Research topics in mep engineering

Mechanical, electrical and plumbing design

MEP design may involve qualified research where system performance under the building's constraints is uncertain — for example unusual loads, efficiency targets or space limits — and alternatives are evaluated.

Energy and systems modeling

Energy, load and fluid modeling used to evaluate alternative system designs is a method of experimentation. Sizing from standard tables generally is not.

Contracts

As with other design professions, contract terms determine whether research is funded research and excluded.

Potential business components

The four-part test is applied to each business component. Examples in this industry:

  • An HVAC, electrical or plumbing system design
  • A controls sequence or strategy
  • An energy recovery or efficiency design

Common technical uncertainties

  • Whether a system meets performance targets in constrained space
  • Which controls strategy achieves stability and efficiency
  • How systems interact under peak and part-load conditions

See technical uncertainty.

Potential experimentation

  • Energy and load modeling of alternatives
  • Computational fluid dynamics studies
  • Commissioning tests designed to evaluate alternatives

See process of experimentation.

The four-part test in mep engineering

TestApplication
Permitted purposeSystem performance and reliability.
Technological in natureThermodynamics, fluid mechanics, electrical engineering.
UncertaintyAppropriate design for performance targets.
Process of experimentationLoad modeling, simulation and iteration.

Read the four-part test research

QRE examples

Wages

  • Engineers performing system modeling of alternatives

QRE rules: qualified research expenses.

Documentation

  • Load calculations and simulation iterations
  • Design memos
  • Contracts

Potential non-qualifying activities

The statutory exclusions in IRC §41(d)(4) — such as research after commercial production, adaptation or duplication of an existing component, routine quality-control testing, foreign research and funded research — apply to mep engineering projects in the same way as any other industry. The qualified research page lists each exclusion with its source.

Relevant federal rules: four-part test, qualified research, funded research, research location. Build a documentation checklist.

Federal R&D credit considerations

Industry-specific caveats

  • Standard system selection and code-driven sizing are generally not research.
  • Commissioning and testing for acceptance are not research unless they evaluate design alternatives.

Start with the federal R&D tax credit and qualified research expenses; estimate with the federal R&D credit calculator.

Common mistakes

  • Claiming standard-practice design and code compliance.

State considerations

  • Allocate by where engineers performed the work.

Potentially relevant active state programs: Texas, California, Georgia.

Calculators: Texas R&D Tax Credit Calculator, California R&D Tax Credit Calculator, Georgia R&D Tax Credit Calculator.

Frequently asked questions

Does energy modeling qualify?

Energy modeling used to evaluate alternatives under uncertainty can be part of a process of experimentation; modeling solely to document compliance generally is not.

Official sources

General research and educational information, not legal or tax advice. Rules vary by tax year and taxpayer-specific facts affect results. See the disclaimer.