Businesses in this industry may conduct activities that potentially meet the qualified-research requirements. Industry alone does not determine eligibility. Explore credits with the R&D Credit Finder.

What R&D can look like

  • Energy-performance design where outcomes are uncertain and modeled.
  • Novel structural or façade systems requiring analysis.
  • Integration of building systems in unusual configurations.

Research topics in architecture

Technical design uncertainty

Architectural work may involve qualified research where the technical design — not the aesthetic — is uncertain and resolved through analysis and evaluation of alternatives.

Building systems

Integrating structural, mechanical, electrical and envelope systems under conflicting constraints can create technical uncertainty about the appropriate design.

Materials

Evaluating unconventional materials or assemblies for performance, where published data does not answer the question, may involve experimentation.

Energy performance

Designing to energy or daylighting targets where the achievable performance is uncertain, using energy modeling of alternatives, may be a process of experimentation.

Structural coordination

Coordination that resolves technical conflicts through analysis of alternatives differs from routine clash detection and drawing coordination, which generally is not research.

Simulation and prototyping

Simulation (energy, daylight, airflow, acoustics) and physical mock-ups used to evaluate alternatives are methods of experimentation. Aesthetic or style choices are excluded from the permitted-purpose test.

Potential business components

The four-part test is applied to each business component. Examples in this industry:

  • A building design or a significant design element
  • A facade or envelope system
  • An energy or environmental performance strategy
  • A design technique or tool developed by the firm

Common technical uncertainties

  • Whether an envelope design meets thermal, moisture and structural requirements together
  • Which configuration achieves an energy target
  • Whether a long-span or unusual geometry can be built within constraints

See technical uncertainty.

Potential experimentation

  • Energy and daylight modeling of alternatives
  • Parametric design studies evaluated against criteria
  • Physical mock-ups and testing

See process of experimentation.

The four-part test in architecture

TestApplication
Permitted purposeFunction and performance — not style or aesthetics.
Technological in natureEngineering and physical sciences (e.g., energy modeling).
UncertaintyWhether performance targets can be met.
Process of experimentationModeling alternative assemblies and iterating.

Read the four-part test research

QRE examples

Wages

  • Architects and designers performing technical analysis of alternatives

QRE rules: qualified research expenses.

Documentation

  • Energy models
  • Design iteration records
  • Contract risk and rights terms

Potential non-qualifying activities

The statutory exclusions in IRC §41(d)(4) — such as research after commercial production, adaptation or duplication of an existing component, routine quality-control testing, foreign research and funded research — apply to architecture projects in the same way as any other industry. The qualified research page lists each exclusion with its source.

Relevant federal rules: four-part test, qualified research, funded research, research location. Build a documentation checklist.

Federal R&D credit considerations

  • Client contracts frequently determine the funded research outcome — whether payment depends on success and whether the firm retains substantial rights.
  • Style, taste, cosmetic and seasonal design factors do not meet the permitted purpose test.
  • Wages of design staff may be QREs only for time spent on qualified research — see qualified wages.

Industry-specific caveats

  • Aesthetic design decisions are excluded.
  • Routine code compliance, drawing production and permitting are not research.
  • Time-and-materials contracts where the client bears the risk may make the research funded.

Start with the federal R&D tax credit and qualified research expenses; estimate with the federal R&D credit calculator.

Common mistakes

  • Claiming aesthetic design work.
  • Using drawings sets as the only evidence.

State considerations

  • Design office location governs state research location, not the building site.

Potentially relevant active state programs: California, Massachusetts, Texas.

Calculators: California R&D Tax Credit Calculator, Massachusetts R&D Tax Credit Calculator, Texas R&D Tax Credit Calculator.

Frequently asked questions

Does architectural design qualify?

Aesthetic design does not. Technical design that resolves uncertainty through experimentation may, subject to funded-research rules.

Official sources

General research and educational information, not legal or tax advice. Rules vary by tax year and taxpayer-specific facts affect results. See the disclaimer.